Load Cooperative

back to all programs
Program NameLoad Cooperative
Utility AdministratorAustin Energy
Location(s)TX
OpenADR RequirementOpenADR 2.0 - specific equipment tested
DescriptionCommercial and Industrial customers with at least 20 kW of load shed available can participate. Events are 4-8pm on summer weekdays, expected to be 15 events / year.
Sector(s)

Industrial

Commercial

Device Types(s)

HVAC / Thermostat

Water Heater

Lighting Controls

Building Management System

Industrial Controls

Incentive TypesLoad shifting incentive
Description of Incentives

1.45 / kWh curtailed, up to $58,000 / year